Spec Build Calculator: Construction Loan, Cash to Close and Profit

Enter the land, the build budget and the sale price to estimate your construction loan, the cash you need at closing, the interest you pay on drawn funds and your profit. At our 85% loan-to-cost standard, the loan is the lesser of 85% of project cost and 75% of the finished value; this calculator uses a more conservative 70% of value.

It runs on the terms of our ground-up construction loan program in Florida, Georgia, South Carolina, North Carolina and Tennessee. Every formula is written out below the calculator.

Run your numbers

Your construction budget must include a 10% contingency. Every budget we finance carries one, so a budget without it understates your project cost. The calculator opens with the example below.

The land

Buying: the purchase price (or the appraised value, if lower). Already own it: the purchase price, or the appraised value if you have owned it 6+ months and permitting work has been done.

Hard costs plus permits, GC fees, plans and architectural work, plus a 10% contingency. Example: a $600,000 build plus a 10% contingency is a $660,000 budget.

What the finished house will sell for, based on recent comparable sales.

Up to 6 months of interest on the day-one land advance, financed in the loan.

%

Commissions and seller closing costs, as a percent of the sale price.

Estimated loan

$857,268

85% of project cost limits this loan. 85.0% of project cost, 61.2% of ARV. Assumed rate 9.5%.

Loan terms

Total loan amount
$857,268
Day 1 advance
$180,000
Construction holdback
$668,718
Interest reserve (6 mo.)
$8,550
Assumed rate
9.5%
Origination
1.5%
Term (build + sale)
13 months
Budget not covered by the holdback
$31,283

Cash at closing

Land price
$300,000
Day 1 advance
-$180,000
Origination (1.5%)
$12,859
Processing fee
$2,500
Appraisal
$1,000
Title and closing (1%)
$8,573
You bring
$144,932

Profit

Sale price
$1,400,000
All costs, including land, interest and selling
$1,168,637
Estimated profit
$231,363
Margin on sale price
16.5%

70% rule check

70% × $1,400,000 − $700,000 = $280,000 maximum land price. Your land, at $300,000, is $20,000 over it.

Month-by-month interest
MonthBalance drawnInterest
1$180,000$1,425
2$246,872$1,954
3$313,744$2,484
4$380,615$3,013
5$447,487$3,543
6$514,359$4,072
7$581,231$4,601
8$648,102$5,131
9$714,974$5,660
10$781,846$6,190
11$848,718$6,719
12$848,718$6,719
13$848,718$6,719

Estimates only, not a loan approval or a commitment to lend. Rates are assumptions for the estimate, not a quote. Business-purpose loans only.

How the Calculator Works

Each result comes from the formulas below, in this order.

StepFormulaNotes
Land advance60% of land value, or 70% with permits approved and issuedFunded at closing. On land you own with a mortgage, it pays off the mortgage first. On land you own, what is left can be paid to you, up to $500,000.
Interest reserveLand advance × rate ÷ 12 × months chosen (0 to 6)Financed in the loan and drawn monthly to pay interest.
Total project costLand value + construction budget + interest reserveThe budget includes hard costs, permits, GC fees, plans and a 10% contingency.
Loan requestedLand advance + 100% of the construction budget + interest reserveWe can finance up to 100% of the construction budget.
Loan limitThe lesser of 85% × total project cost and 70% × ARV, from $200,000 to $5MIf the limit is lower than the loan requested, the construction holdback is reduced and you fund that part of the build yourself.
InterestBalance drawn × rate ÷ 12, each monthThe land advance accrues from day one. Construction draws are spread evenly over the build. The full balance accrues while you sell.
Cash at closingLand price (if buying) or mortgage payoff (if any) − land advance + 1.5% origination + $2,500 processing + $1,000 appraisal + 1% title and closingPoints, the processing fee and closing costs are not financed. The calculator uses the top of each fee range.
ProfitARV − land − budget − interest − fees − draw inspections − selling costsDraw inspections: 5 draws × $295, flat, virtual or in person.

The calculator assumes a rate of 9.5% on every loan size. That is an assumption for the estimate, not a quote. As of October 2026, our rates are from 9% (minimum FICO 680, 85% LTC standard, in FL, GA, SC, NC and TN), and points are 1% to 2% of the loan amount; the calculator uses 1.5%. Your rate depends on the deal: see how construction loan rates are set, and how a construction loan works from closing to the exit.

The calculator caps the loan at 70% of ARV as a conservative estimate. Our program maximum is 75% of ARV. Updated . Business-purpose loans only.

Example Spec Build Calculation

An example calculation with round numbers, not a funded loan: a builder buying a lot with no permits issued at closing, building a single family home for sale.

Land purchase price (no permits issued at closing)$300,000
Construction budget, including the 10% contingency$700,000
Expected sale price (ARV)$1,400,000
Land advance at closing (60% of land value)$180,000
Interest reserve (6 months on the land advance at 9.5%)$8,550
Total project cost$1,008,550
Loan requested (advance + full budget + reserve)$888,550
85% of project cost$857,268
70% of ARV$980,000
Loan (the lesser limit)$857,268
Construction you fund yourself$31,283
Cash at closing (land equity plus fees)$144,932
Interest over 13 months (10 building, 3 selling)$58,230
Estimated profit after 6% selling costs$231,363 (16.5% of sale price)

85% of project cost is the lower limit here, so the loan is $857,268, not the $888,550 requested. The difference, $31,283, comes out of the construction holdback: the builder funds that part of the build. Of the $58,230 in interest, the reserve covers $8,550; the builder pays the rest during the loan.

What Is the Monthly Payment on a Construction Loan?

At an assumed rate of 9.5%, interest only, the monthly payment on a $200,000 construction loan is about $1,583 once the loan is fully drawn. Before that it is lower, because interest is charged only on the money you have drawn.

Loan, fully drawnAssumed rateMonthly interest
$200,0009.5%$1,583
$300,0009.5%$2,375
$500,0009.5%$3,958
$1,000,0009.5%$7,917
$2,000,0009.5%$15,833
$3,500,0009.5%$27,708

Our construction loans are interest only at a fixed rate, so there is no principal in the monthly payment. Formula: loan drawn × rate ÷ 12. Rates assumed for the example. Business-purpose loans only.

Do You Need 20% Down for a Construction Loan?

No. At our 85% loan-to-cost standard you contribute at least 15% of total project cost, and land you already own counts toward it. Points, the processing fee and closing costs are paid in cash on top of that contribution.

How the contribution is counted, and how land equity can cover all of it, is on the construction loan down payment and LTC page.

The 70% Rule for New Construction

The 70% rule says the most you should pay for a property is 70% of its after-repair value minus the cost of the work. Applied to a spec build, the work is the construction budget, and what you are buying is the land.

Maximum land price = 70% × ARV − construction budget

In the example above: 70% × $1,400,000 − $700,000 = $280,000. At $300,000, that lot is $20,000 over the rule, yet the calculator still shows a 16.5% margin after all costs.

The rule is a quick screen, not a lending test. We size a construction loan on project cost and finished value, as shown above.

By Maximiliano Extrakt, Co-Founder, Domus Lending Group. Updated .

Estimates only, not a loan approval or a commitment to lend. Business-purpose loans only.

Numbers work? Send us the project.

Once we have all the information we need, we can price your deal the same day.